    Warehouse Relocation in Antioch, TN

    Warehouse relocation in Antioch, TN often means leaving an older 18 to 24 foot building off Bell Road or Murfreesboro Pike for something taller down I-24. Your existing pallet rack can usually make that trip with you.

    The work is not just unbolting steel. The rack has to be counted, checked and redrawn for a building it was never designed around.

    (615) 703-6869

    Start With an Honest Count of Your Rack

    Before anything comes down, we list every upright frame, beam pair and accessory by size. Mixed brands from years of add-ons are common in Antioch buildings.

    That inventory shows what can move, what needs matching parts and what should stay behind.

    Frames with bent columns or crushed bracing get flagged now. Damaged parts are replaced with new components rather than reinstalled.

    Pallet rack frames and beams in an industrial warehouse
    Selective rack rows with wire decking

    Drawing the Rack Relocation Layout for a Taller Building

    A frame that stood 16 feet in Antioch may look short in a 32-foot shell. Sometimes the answer is new taller frames carrying your existing beams.

    We draw the new building with its columns, doors and dock positions, then place your rack and show where new steel fills gaps.

    Beam levels get rechecked against the new pallet heights and your truck's reach.

    Leaving the Old Antioch Building Clean

    Most leases expect the floor returned clear. Once the last row is down, anchor holes and floor marks need attention under the terms your landlord sets.

    We pull anchors as part of teardown and leave the area swept of hardware, so your walkthrough with the landlord goes smoothly.

    Anything you choose not to move, such as odd frames or worn beams, can be hauled off rather than left behind.

    Keeping Orders Moving During the Move

    Few distributors can stop shipping for a week. We phase teardown so the last rows to come down hold the fastest movers.

    The new building gets its first rows up before the old one is emptied. Product moves in waves rather than all at once.

    Summer moves in unconditioned buildings start early in the day, with steel staged clear of active docks.

    What Your Team Does on Move Days

    Your staff move product; we move steel. Agreeing that split ahead of time avoids confusion on the floor.

    Each morning we confirm which rows come down and which product must be out of them first. Pallets left in a row slow the whole day.

    A single contact on your side who can answer questions keeps the crew working.

    Questions to Settle Before a Pallet Rack Relocation

    Will the pallets change size in the new building? Will you run the same lift trucks? Is the new clear height going to change beam levels?

    Answering those early stops surprises on install day. In a move from Murfreesboro Pike to a bigger I-24 building, the answers often change the whole layout.

    We walk through each question on a call and record the answers on the drawing.

    Teardown, Transport and Reinstall

    Beams come off level by level, frames are laid down, and parts are bundled and tagged by row. Tags make the reinstall faster and keep matched parts together.

    At the new site, frames are stood, beams set to the new elevations and every upright anchored to the floor. Experienced installation crews we schedule and manage handle each step.

    Adding Pallet Rack Relocation Capacity With New Storage

    A move is a good time to rethink storage. Deep reserve stock may suit pushback rack in Antioch, and dated product may suit pallet flow rack in Antioch.

    New components match the profile of your moved rack wherever possible.

    Pricing the Move

    Start by sending photos, any rack count and both addresses. You receive a layout and itemized pricing for teardown, transport, replacement parts and reinstall.

    Nashville Pallet Racks operates as a division of Warehouse Equipment & Supplies Co., a company putting rack into buildings since 1997. Details are on our warehouse relocation service page and the Antioch service area page.

    Call (615) 703-6869

    Recent Pallet Rack Projects

    A look at warehouse racking systems our team has installed.

    Carton flow pallet rack installation
    Drive-in pallet rack installation
    Installed industrial pallet racks
    Warehouse pallet racks with wire decking
    Installed pallet rack system in a warehouse
    Industrial warehouse racking installation
    Pallet rack systems installed in a warehouse
    Warehouse racking project
    Installed cantilever racking
    Installed push back pallet rack system

    Plan Your Warehouse Relocation in Antioch

    Send the basics and we will follow up with a layout and pricing. Prefer to talk it through? Call (615) 703-6869.

    Nashville Pallet Racks

    1161 Murfreesboro Pike

    Ste 110 #230

    Nashville, TN 37217

    (615) 703-6869

    Monday - Friday: 8:00 AM - 6:00 PM

    We respect your privacy. Your information will never be shared.

    Warehouse Relocation Questions From Antioch Buyers

    Nearby Areas We Also Serve

    Our delivery and installation territory covers Middle Tennessee, so one team can handle multiple buildings for the same company.

    Where We Work

    Located in Nashville, we serve the entire Greater Nashville region with industrial pallet racks and warehouse storage solutions.

    Nashville Pallet Racks

    Address

    1161 Murfreesboro Pike
    Ste 110 #230
    Nashville, TN 37217

    Business Hours

    Monday - Friday: 8:00 AM - 6:00 PM
    Saturday: Closed
    Sunday: Closed

    Need Warehouse Relocation in Antioch?

    Call (615) 703-6869 or request a quote and we will get a layout started.

    (615) 703-6869
    Tap to Call