Warehouse Relocation in Franklin, TN
Moving from Mallory Lane flex space to a larger building along I-65 requires a new layout rather than copying short rows from the old unit. For a williamson county business trying to keep reserve inventory inside a limited warehouse footprint, warehouse relocation in Franklin starts with the stock-transfer sequence and the destination layout. A storage move is not just a freight job. The destination needs a workable layout before old rows are taken apart, and labeled components must arrive in the sequence that the installation crew can use.
Cool Springs commercial activity, Mallory Lane flex space, and businesses along Columbia Avenue create a mix of smaller distribution and supplier operations. The storage portion of a flex building must remain usable without swallowing the loading approach or the space needed for smaller orders. Send drawings of both buildings, your rack inventory, move dates, and handling requirements. We can review reuse, phasing, and transport responsibilities before the destination layout and teardown schedule are approved. Moving unidentified or damaged components can carry the old building’s problems into the new one.
Why Franklin Warehouses Work With Us
Moving from Mallory Lane flex space to a larger building along I-65 requires a new layout rather than copying short rows from the old unit. Around Mallory Lane and Columbia Avenue, that situation calls for a move sequence tied to your own inventory and destination building. A storage move is not just a freight job. The destination needs a workable layout before old rows are taken apart, and labeled components must arrive in the sequence that the installation crew can use. We start with your drawings, inventory records, and photographs, so the conversation stays focused on the building and loads you actually have.
Identify reuse, replacement, new rack, and transport responsibilities in one plan. Schedule inventory clearance before teardown and return destination storage to service by agreed zones. The comparison should show what you gain, what access you give up, and where staging remains available. The move plan must name who empties the racks, who handles inventory, and who provides freight. Our team handles the permit side for you.
You work through the design and itemized scope with one contact at Nashville Pallet Racks, a division of Warehouse Equipment & Supplies Co. We explain component choices, confirm the proposed load ratings, and agree delivery and installation responsibilities before you order. If the product is not a fit, the alternative belongs in the discussion, not after the rack arrives. Call (615) 703-6869 to review the plan and any phasing needs.


Operations We Rack Around Here
Local freight and industrial connections include Mallory Lane, Columbia Avenue, I-65.
How Warehouse Relocation Works
Teardown, labeling, transport coordination, and reinstallation planned around your move to a new building.
Inventory and new layout
Identify rack components, load requirements, and the new building’s dimensions before scheduling teardown.
Teardown and labeling
Unload designated rows, dismantle the system in sequence, and label components so compatible parts stay together.
Transport coordination
Group and bundle material around the agreed loading plan and delivery sequence. Confirm responsibility for freight in the quote.
Reinstallation and handover
Rebuild the approved layout, replace unsuitable components, and provide ratings for the finished configuration.
What a Warehouse Relocation Project Includes
Start with the move dates, drawings of both buildings, your existing rack inventory, and the loads you intend to store. Photos of frame profiles, beam connectors, damage, and current labels help establish what can be reused. A rack that worked in the old building is not automatically suited to a different beam spacing or load profile.
We plan the destination layout before teardown. Column locations, clear height, dock approaches, lift truck turning space, and staging areas decide where rows belong. The proposal separates reusable material from replacement frames, new beams, decking, protection, and additional rack. Our team handles the permit side for you.
Your team clears inventory from the scheduled work zone. Teardown follows a controlled sequence; components are labeled, sorted, and bundled by system so matching parts reach the new building together. Transport coordination covers loading order, delivery windows, and who provides the carrier. We do not assume that general warehouse movers will understand rack connections or the installation sequence.
At the destination, crews reinstall the approved rows, align and anchor frames, secure beams and accessories, and verify the configuration against the drawing. Damaged or incompatible components are not treated as usable simply because they survived the move. Handover includes configuration-specific load ratings and a review of outstanding items. A phased plan can return agreed storage zones to service while later areas are completed; the schedule depends on building access, inventory readiness, and confirmed material availability.
Recent Pallet Rack Projects
A look at warehouse racking systems our team has installed.








Plan Your Warehouse Relocation in Franklin
Send the basics and we will follow up with a layout and pricing. Prefer to talk it through? Call (615) 703-6869.
Nashville Pallet Racks
1161 Murfreesboro Pike
Ste 110 #230
Nashville, TN 37217
(615) 703-6869Monday - Friday: 8:00 AM - 6:00 PM
Warehouse Relocation Questions We Hear Most
Rack Products and Related Services in Franklin

Pallet Rack
Every pallet reachable, every time. The baseline we size everything else against.
View details
Pushback Rack
Two to six pallets deep from one aisle, without giving up much reach.
View details
Pallet Flow Rack
Load one side, pick the other, and let gravity enforce first in, first out.
View details
Drive-In Rack
Forklifts enter storage lanes instead of working an aisle between every row. Built for deep inventory of a few SKUs.
View details
Cantilever Rack
Arms with nothing in front of them, built for lumber, pipe, and anything a pallet can't hold.
View details
Carton Flow Rack
Cases advance to the picker instead of the picker hunting for cases.
View detailsNearby Areas We Also Serve
Our delivery and installation territory covers Middle Tennessee, so one team can handle multiple buildings for the same company.
Where We Work
Located in Nashville, we serve the entire Greater Nashville region with industrial pallet racks and warehouse storage solutions.
Nashville Pallet Racks
Address
1161 Murfreesboro Pike
Ste 110 #230
Nashville, TN 37217
Phone
(615) 703-6869Business Hours
Monday - Friday: 8:00 AM - 6:00 PM
Saturday: Closed
Sunday: Closed
Need Warehouse Relocation in Franklin?
Call (615) 703-6869 or request a quote and we will get a layout started.